> I also wonder how that would affect the chances of an accident - instead of inspecting one cooling system, you're checking 20, and with 19 more parts to potentially fail
But each of those failures would be pretty unspectacular with little to no impact on the environment or the stability of the power grid. Which in turn allows you to use lower cost (automated) failure detection systems.
But each of those failures would be pretty unspectacular with little to no impact on the environment or the stability of the power grid. Which in turn allows you to use lower cost (automated) failure detection systems.